1 Introduction
This chapter explores opportunities to improve the governance of shipping and related activities in Canadian Arctic waters through the application of the federal Impact Assessment Act (IAA).1 Arctic waters, for the purposes of this chapter, will consist of the waters within the NORDREG Zone, including the portion
The chapter considers a range of activities potentially associated with shipping in the Arctic, such as vessels used in fishing and aquaculture, supply vessels for northern communities and industries, shipping related to the transportation of resources extracted in the Canadian Arctic, shipping related to energy projects, tourism and other passenger related shipping, and the Arctic as a shipping route for global trade. The chapter considers the role that each of four distinct assessment processes under the IAA could make to the governance of shipping. Given the prevalence of other assessment processes in the Canadian Arctic, the chapter then considers how the IAA’s processes will interact with assessment processes beyond the IAA, such as those at territorial and Indigenous levels.
The first two processes under the IAA with potential implications for shipping in the Arctic are project level assessments. One is the assessment process for designated projects, which includes any project listed in a regulation under the IAA and associated activities.4 The chapter explores which of the projects currently listed may have relevance to Arctic shipping, and whether other activities with shipping implications could be considered for addition to the designated project list or ad hoc designation by the Minister of the Environment (the Minister). We also offer an overview of the assessment process requirements for designated projects. The other project level process relates to the assessment requirements for projects on federal lands.5
The two other processes in the IAA deal with higher tier assessments rather than with individual projects. One of these offers opportunities for sectoral or other strategic assessments to inform project level assessment decisions. Examples include a strategic assessment of particularly pressing issues such as potential shipping routes, a strategic assessment of shipping in the Canadian Arctic more broadly, or of a particular type of activity or industry sector, such as fishing, mining, or energy production. The other higher tier process provides for regional assessment. Regional assessment could be developed at a range
1.1 Activities with Implications for Arctic Shipping
Dawson et al. suggest that the Arctic may be the region most dependent on the marine transportation industry in Canada.7 In considering the application of the IAA to shipping activities in the Canadian Arctic, there is potentially a huge range of human activities that can influence shipping in Canadian Arctic waters. This section offers a high-level overview of some of the key activities that either are taking place in the Canadian Arctic, or that can be anticipated to be proposed in the foreseeable future, that could be subject to assessment processes. These activities are considered broadly in two categories, land-based activities that have implications for Arctic shipping, and ocean-based activities.
Starting with land-based activities, marine terminals and associated infrastructure are an obvious category of activity to consider. Marine terminals in national parks of any size, and marine terminals outside national parks for vessels over 25,000 DWT are included as designated projects under the IAA. Port developments can be critical to ensure adequate infrastructure to respond to emergencies, including environmental emergencies such as spills of cargo and fuel from ships. Port developments can include a range of elements, from emergency and spill response to inland transportation infrastructure to support the port, storage facilities such as tank farms and fuel supply to measures to improve access to a port in harsh winter conditions, and places of refuge for ships in need of assistance. Of course, port infrastructure can also lead to an increase in ship traffic, on the basis of ‘if you build it, they will come.’ Port developments may be proposed for a particular purpose, such as improved safety and emergency response, or improved supply of existing communities, but may affect shipping in many other ways, such as an increase in tourism, transit of commercial vessels through the area, or other commercial activity enabled by improved port facilities. Currently there are multiple proposals for ports in the Canadian Arctic, most notably in Tuktoyaktuk, Northwest Territories8 (NWT) and in Qikiqtarjuaq and Chesterfield Inlet, Nunavut.9
Among other land-based activities with clear connection to shipping are mining, oil and gas exploration and other resource extraction industries. A recent example is the assessment of the expansion of Baffinland’s Mary River Mine, which was expected to cause a significant increase in shipping in the region.11 Such industrial activities also tend to lead to an influx of workers, who in turn will depend in part on supply vessels for the provision of food and other essentials. The activities themselves will require supplies that may have an impact on shipping patterns. Finally, these industries ultimately extract resources that will be required to be shipped to markets, usually outside the Arctic region.12 Other land-based activities with implications for shipping are Arctic settlements in need of supplies ranging from fuel to building materials and food.
In addition to land-based activities, there are a number of ocean-based activities that can be expected to have implications for Arctic shipping patterns.
Some of these activities, such as offshore aquaculture or offshore renewable energy exploration, may be a long way off or may never become technically or economically feasible. Other activities, such as offshore oil and gas development, are currently subject to a moratorium, and may never again be approved in the Canadian Arctic region in light of concerns about local environmental impacts and global efforts to decarbonize. However, if they are proposed, their approval would have considerable implications for Arctic shipping and assessment. Other activities, such as trans-Arctic shipping, tourism, fishing, marine scientific research and marine protection are already taking place or under active consideration in the Canadian Arctic, and can be expected to continue and increase in the future.
The question of the federal role in dealing with this range of activities in the Canadian Arctic is less of a constitutional issue than it is a question of the evolving relationship between the federal government and the relevant territorial and Indigenous governments and Indigenous organizations in the region. Nevertheless, the constitutional division of powers between the federal and provincial levels of government have clearly been influential in the development of these relationships, as has section 35 of the Constitution with respect to Indigenous communities and organizations.13 Ultimately, there are many issues that arise from these activities for which the federal government has responsibility. Most directly, in light of the focus of this chapter, the federal government has responsibility for navigation and shipping, as well as jurisdiction over many of the potential biophysical impacts of shipping and related activities, such as marine pollution, and the protection and management of aquatic, endangered and migratory species to name a few.14 Of course, other elements such as occupational health and safety and workers’ compensation,
The potential for environmental degradation of the Arctic marine and coastal ecosystems due to shipping is well known.15 Environmental concerns in the Arctic region are heightened as a result of the extreme fragility of the ecosystems found there. The species that make the Arctic marine environment their home are highly specialized to the cold temperatures and ice covered oceans, meaning that the ability of Arctic ecosystems to evolve and adapt to changes is low.16 In the context of climate change, the Arctic’s vulnerability to oil pollution and invasive species impacts is compounded by ongoing changes to environmental conditions resulting from changes to the climate system.17
The reality of maritime shipping is that some degree of pollution and consequent environmental degradation is inevitable as ships spill and leak oil as part of regular operations, and even where zero discharge rules exist such as under the Arctic Waters Pollution Prevention Act, monitoring and enforcement of this is challenging.18 Ultimately, the pollution risk from shipping increases with the amount of vessel traffic in a given area.19 There are several important factors that make the Arctic especially vulnerable to damages from oil spills, including vulnerable species, highly specialized ecosystems, extreme remoteness, and difficult conditions for cleanup efforts.20 Oil contains elements that are toxic to many forms of animal and plant life meaning that oil in the environment, either through large discharge events or prolonged leaks, can have
Lindgren et al. found that 34 percent of global hydrocarbon pollution in marine regions resulted from shipping. Broken down further, only 9.8 percent of global discharges to the sea are the result of accidental spills from events such as groundings, collisions or explosions that release enormous amounts of oil.23 The remaining 24 percent of shipping related discharges to the sea, representing the largest source of oil discharged to the sea from human activity, result from operational discharges from routine operations. Routine operations, like discharges of bilge water, cleaning of tanks and bunkering, are responsible for the majority of small oil spills, and small continuous leaks are common on older ships. Small leaks can come from propeller shaft bearings, for example.24 Rules in the Arctic are more stringent than elsewhere, so the contribution of operational discharges in the region would be expected to be well below the global average, but this has not been tested.25
Projections of expected increase in trans-Arctic shipping and significantly longer shipping seasons are common place.26 Receding summer sea ice, while it represents one of the most dramatic depictions of climate change on the
2 Assessment Processes under the IAA
This section introduces four distinct assessment processes under the IAA that have the potential relevance for shipping related activities in the Canadian Arctic. We first introduce the standard project level assessment process for projects designated for assessment. We then consider separate project level assessment requirements in the IAA for projects on federal lands and projects outside Canada that are funded or otherwise supported by the federal government. This is followed by an overview of strategic and regional assessments, two processes included in the IAA that allow for assessment to go beyond individual projects to consider a broader range of issues and activities.
2.1 Assessment of Designated Projects
Projects can be designated for assessment either through a physical activity list in regulations or through ministerial discretion. This assessment process is most commonly initiated for projects on the physical activity list. The physical activity list regulation essentially creates a presumption that an impact assessment is required, but the Impact Assessment Agency of Canada (the Agency), which is the federal agency tasked with administering the IAA regime, has the ultimate power to determine, during the planning phase of the assessment, whether an assessment ultimately has to be carried out. For projects not on the list, the presumption is that no assessment is required. However, the Minister has the power to require an assessment either in response to a request to designate a project or on the Minister’s own initiative.28 The request can be made by anyone.
It is of course difficult to predict with certainty which of the activities designated under the IAA, if proposed in the Arctic region, would involve significant shipping activity. Our aim here is to highlight some of the types of activities that could be involved, not to offer a definitive list. Some, such as aquaculture
The process for conducting an impact assessment for designated projects consists of a number of phases, including the planning phase, the assessment and review phase, the decision-making phase and the post approval follow-up phase (Figure 16.1). The process is outlined in detail in the growing literature on the new IAA, so a brief overview will suffice for purposes of this chapter.30
Overview of IAA process for designated projects
The planning phase is one of the innovations of the IAA. Its aim is twofold, to determine whether an assessment is needed, and, assuming one is needed,
Ultimately, the Agency, which leads the planning phase, has to plan an assessment that considers the factors set out in section 22 of the Act. Factors listed in section 22 include both positive and negative effects of the proposed project, and cover a broad range of biophysical, social, economic, health and cultural effects of the proposed project, including mitigation measures, cumulative effects, alternatives, accidents, impacts on Indigenous communities and the rights of Indigenous peoples. Included in the factors is also the requirement to take into account project-specific and regional assessments conducted by an Indigenous governing body.32 The assessment has to inform a number of key determinations that need to be made under section 63 of the Act as part of the ultimate public interest determination, including the extent to which the project contributes to sustainability, the impact it will have on rights and interests of Indigenous communities, the impact it will have on Canada’s ability to meet its climate commitments and environmental obligations, and the significance of adverse effects of the project that are within federal jurisdiction.33
Following the conclusion of the planning phase, the proponent has up to three years to prepare its impact statement and initiate the assessment phase. In the meantime, the Minister has to decide whether the assessment is to be carried out by way of an Agency led process or by an independent review panel. With some exceptions, the Agency led assessment has to be carried out within 300 days of the commencement of the assessment phase, and the assessment by a review panel has to be carried out within 600 days, subject to time stoppages and extensions available under the Act. The substantive requirements of the assessment are similar, as are the decisions the assessments will inform. The key legislative differences between the processes are the timelines and
At the conclusion of the assessment phase, a final report is prepared by the Agency or the review panel and submitted to the Minister or Cabinet for a project decision. The report has to inform the key determinations noted above that must be made under section 63 of the Act, and ultimately the report informs the public interest determination and the terms and conditions under which a proposed project may be approved. One of the terms and conditions of approval will be the implementation of a follow-up program designed during the course of the assessment.35
2.2 Assessment of Projects on Federal Lands
There are two categories of projects that require some form of assessment even if they are not designated for assessment under the process described in the previous section. We refer to these as federal projects because these are projects that are either proposed by or substantially supported by the federal government that may require assessment under the IAA. One category of federal projects involves projects on federal lands. This is the category of projects most relevant to this chapter.36 There are a number of fundamental differences between the assessment requirements for designated projects and those for projects on federal lands. We highlight the key differences in this section.37
At the start, these requirements apply to projects on federal land, so it is important to consider the definition of federal land, and what it means in an Arctic context. Federal land includes all land owned by the federal government, including any offshore area that is not part of a province (or territory), including Canada’s internal waters, territorial sea, the continental shelf and the exclusive economic zone. Also included under federal lands are lands that are set aside for bands under the Indian Act, which would primarily have relevance in areas of the Arctic within provincial boundaries, notably the Hudson
The trigger for projects on federal lands is similar to the trigger under the Canadian Environmental Assessment Act, 2012 (CEAA 2012). At the core is a definition of project that is quite broad for activities carried out in relation to a physical work. For such activities proposed on federal land, the assumption is that the requirements in sections 81–91 of the Act apply, unless the project is excluded in some way. For other activities not related to a physical work, the assessment requirements in this part only apply if the activity is designated by the Minister.39
The scope of an assessment under this part is similar to CEAA 2012 in the sense that environmental effects are limited to biophysical impacts and their socioeconomic consequences, plus impacts on Indigenous peoples. The process requirements are minimal. There is a requirement to post a notice before making a project determination, and a requirement to post a notice of the determination made. There is no requirement to consider public input, but when input is sought, a notice has to be posted inviting such input.40
In short, the process is largely discretionary and in the hands of the federal project decision-maker. There are no legislative process requirements beyond notice, there is no guaranteed public participation, no participant funding, and no legislated role for Indigenous communities, though the duty to consult of course remains, as does the government’s commitment to the United Nations Declaration on the Rights of Indigenous Peoples (UNDRIP). Having said this, some federal decision-makers to whom these provisions apply have their own established assessment processes, as they had similar assessment responsibilities under CEAA 2012.41
The project decision involves two steps, also based on the decision-making process in CEAA 2012. First, the federal authority in charge of the federal
2.3 Regional and Strategic Assessments
The IAA has separate provisions for the conduct of regional and strategic assessments. The Act does not include definitions of regional or strategic assessments, and the line between them is not clearly drawn in the Act or guidance to date, so we deal with them together in this section.43
Regional assessments are not defined; however, the Act does offer some indication of the types of assessments contemplated. As a starting point, the Act suggests that there are three categories of regional assessments. One category would be assessments of regions that are entirely on federal lands. A second category would be assessments of regions that are completely outside federal lands. A third category are assessments of regions that are partly on and partly outside federal lands.44
Ultimately, regional assessments can be carried out in each of the three categories identified, so they are not determinative of whether a federal regional assessment will be carried out. Having said this, it seems clear that the categories are motivated by the recognition that carrying out a regional assessment on federal lands will be less complex than one in the other two categories. In practical terms, it seems likely that regional assessments in categories two and three are more likely to be carried out if the other jurisdictions are willing to cooperate in the conduct of a regional assessment. In the Canadian Arctic, this means cooperation with either a territorial government, co-management boards, or an Indigenous organization under a land claims agreement.45
Strategic assessments are also not defined in the Act. Again, there are some indications of what types of assessment are contemplated. The Act specifically identifies the possibility of conducting a strategic assessment of proposed or
3 The IAA and Other Assessment Regimes in the Canadian Arctic
There are several assessment regimes in the Canadian Arctic other than the IAA. They exist under territorial legislation and land claims agreements, and they typically have significant, if not primary, roles to play in impact assessment in the Arctic. For the most part, these regimes are based on a co-management model, whereby the assessment regime is a requirement under a land claims agreement and the reviewing body is composed of individuals appointed by the Indigenous treaty party and the federal and territorial governments, respectively. However, in most situations the responsible federal minister is the final decision-maker.47 Beyond these formal assessment regimes, there are various ways in which strategic or regional assessment could be undertaken; examples of these are discussed further below.
3.1 Project-Level Assessment in the Western Arctic: Inuvialuit Settlement Region, Yukon, and Northwest Territories
In most of the Western Arctic, project-specific assessment is governed by the Inuvialuit Final Agreement48 (IFA) and the Impact Assessment Act.49 Unlike in the Nunavut context discussed below, the IAA can indeed apply in the
Map identifying the boundaries of the Inuvialuit Settlement Region
SOURCE: IFA JOINT SECRETARIAT
Aside from the Mackenzie Gas Project,54 which proceeded by Joint Review Panel and did not have a shipping component, there are no examples of the legislated federal impact assessment regime being deployed in the Inuvialuit Settlement Region (i.e., not under the IAA or its predecessors). However, there are at least two proposals in the very early stages that could change this situation, both of which would have significant shipping dimensions. One is focused on developing natural gas fields in the offshore, as well as associated pipelines and two offshore liquefaction and tanker loading platforms far off Tuktoyaktuk.55 The other is a long-standing proposal to
In the Yukon, similar to the Nunavut context discussed below, the Yukon Environmental and Socio-economic Assessment Act (YESAA) explicitly states that the Impact Assessment Act does not apply in the Yukon.59 As such, for land-based (but potentially shipping related) projects in the North Slope of the Yukon (see Figure 16.2) there would be interrelated processes between the IFA regime and an assessment under YESAA. The North Slope is given special explicit treatment in YESAA,60 which in basic terms creates a crosswalk to the IFA regime. For example, section 90(2) requires that the reviewing body under YESAA also takes into consideration “the need to protect the rights of the Inuvialuit” under the IFA, and “may take into consideration any matter that it considers relevant.”61 However, it is the IFA regime that takes over the process in contexts where the Inuvialuit Screening Committee refers to the
3.2 Project-level Assessment in the Eastern Arctic: Nunavut64
The process for project-specific assessment in Nunavut is set out in Article 12 of the Nunavut Land Claims Agreement (Nunavut Agreement),65 which provides a comprehensive impact assessment regime that takes into account ecosystemic and socioeconomic impacts of proposed projects.66 The Nunavut Impact Review Board (NIRB) is responsible for implementation of impact assessment (IA) in Nunavut, as detailed in Article 12.67 Since coming into force in 2015, the Nunavut Planning and Project Assessment Act68 (NuPPAA) provides additional detail and structure for IA in the Nunavut context for both IA and land use planning.69 NuPPAA is explicit in stating that the Impact Assessment Act does not apply in the Nunavut Settlement Area and the Outer Land Fast Ice Zone.70
However, if a NIRB screening decision71 determines that a review of the proposed project is required, the responsible minister72 has discretion under section 94(1) to refer the project to a “federal environmental assessment panel” or a “joint panel.”73 Such discretionary referral is constrained by specific parameters such as a project involving a matter of national interest, a project being carried out partly outside the designated area, and consultation with the territorial minister and NIRB. The national interest dimension is additionally constrained through subsection 94(2) which stipulates that the Minister may only refer the project to a federal panel on the national interest
Nevertheless, though it has yet to happen in practice, the IAA may still be relevant in a few ways. First, if a project is to be carried out partly outside the Nunavut Settlement Area and beyond the Outer Land Fast Ice Zone, and the transportation of goods is a significant element of the project that warrants a federal review, then presumably the IAA could apply. While the regime offers a very narrow pathway to this process, this could be the case in federal waters in Baffin Bay and Davis Strait, which would be very relevant from an Arctic shipping perspective.76 Second, notwithstanding the IAA not applying in Nunavut, if a project is in fact referred to the federal Minister of the Environment for a “federal environmental assessment panel” to conduct the review, presumably that federal panel would be structured in the likeness of review panels under the IAA, even though all aspects of this process option are explicitly laid out in NuPPAA, and NuPPAA would be the governing statute.77 Those provisions include, for example, rules pertaining to panel composition, scoping, consultation, public and Indigenous participation, factors to consider, traditional and community knowledge, final determinations, and approval conditions.78 Third, NIRB has broad powers to consider a range of factors, including “any other matter within the Board’s jurisdiction that, in its opinion, should be considered,”79 meaning that NIRB could take into account factors set out in the IAA but not explicitly set out in NuPPAA, such as climate change and sustainability considerations.80 Finally, there is potential for projects on federal
There is an additional, and perhaps practically most important, basis for the incorporation of IAA considerations into NIRB led assessments. This comes from the responsible Minister’s ability to find that a NIRB report is deficient “with respect to issues relating to the ecosystemic and socio-economic impacts of the project,”82 and to then require the NIRB to conduct further review, including holding a public hearing, on issues identified by the Minister. In cases where the responsible minister is the federal Minister, as was the case for the Mary River Project discussed below, it is reasonable to expect that the federal Minister would require consideration of issues set out in the IAA, such as climate change and sustainability.
An example in the Nunavut context of a project-specific review with shipping dimensions is the Mary River Project. This large iron ore mining project was approved in 201283 after a lengthy, comprehensive review by NIRB under Nunavut Agreement Article 12.84 The project, situated in northern Baffin Island near the community of Pond Inlet, includes exploration, construction, operation, closure, and reclamation of an open-pit mine and associated infrastructure for extraction, transportation and shipment of iron ore (including ports).85 From a shipping perspective, the ore is transported to Europe via a shipping route through Eclipse Sound, Pond Inlet and Baffin Bay.86 The project
In the time since the Mary River project was approved, the proponent has made several amendments,88 and then sought approval for “Phase 2.”89 The second phase proposed an increase in extraction to a total of 12 millon tonnes per annum road and rail haulage, infrastructure development at the Milne Port, and increased marine shipping.90 Similar to the initial process, NIRB led the Phase 2 assessment. There was no federal panel, though federal departments provided input to the process and seemed to play an influential role, which is not surprising given their capacity and expertise.91 The IAA has not been applied to date (nor was CEAA 2012), and it is unlikely to be applied going forward. Despite Phase 2 being a very large mining project, it was not determined to be a project of national significance under NuPPAA and it was not otherwise referred to the relevant federal minister to establish a federal panel. This is presumably owing to the above-described explicit ousting of the IAA and the very narrow pathway for any triggering of the IAA regime in the Nunavut context. Ultimately, NIRB recommended that the Phase 2 not be allowed to proceed, finding that the proposal “cannot proceed in a manner that will protect and promote the existing and future well-being of residents and communities of the Nunavut Settlement Area, and Canada in general, and would not be protective of the ecosystemic integrity of the Nunavut Settlement Area.”92 That NIRB recommendation was accepted by the responsible ministers in a final decision released in November 2022, meaning that Phase 2 is not permitted to proceed at this time due to unacceptable impacts.93
3.3 Strategic and Regional Environmental Assessments in the Canadian Arctic
A strategic environmental assessment or regional environmental assessment of shipping in the Canadian Arctic would not be the first assessment in the
The Beaufort Regional Environmental Assessment (BREA) was a four-year process focused on a specific sector in a specific region, namely, offshore oil and gas development in the Beaufort Sea.94 Its purpose was to generate a basis for “a more efficient and effective environmental assessment regime through the development of regional information to address issues that are likely to recur in individual project‐level environmental assessments.”95 BREA did not take place under a specific statute. Rather, the process was launched by the federal government in 2010, led by the then Department of Aboriginal Affairs and Northern Development Canada (AANDC), and was carried out in partnership with the Inuvialuit, industry, government, regulators, and researchers.96 At a practical level, the process included six working groups focused on nine research areas, none of which were directly focused on shipping.97 Key BREA findings were released in 2016.98
A subsequent phase of the process began in 2016, led by the Inuvialuit Regional Corporation, the Inuvialuit Game Council and Crown-Indigenous Relations and Northern Affairs Canada in the form of the Beaufort Region Strategic Environmental Assessment (BRSEA).99 BRSEA built on BREA as a “proactive planning tool in which hypothetical future industrial development scenarios are assessed to provide an understanding of the mechanisms
Following the federal government’s announcement of a moratorium on oil and gas development in the Canadian Arctic,101 the NIRB led a strategic environmental assessment focused on potential oil and gas activities in Baffin Bay and Davis Strait.102 This matter was formally referred to the NIRB by then Indigenous and Northern Affairs Canada pursuant to section 12.2.4 of the Nunavut Agreement,103 and NIRB issued a final report in July 2019.104 The purpose was to develop “an improved understanding of potential types of oil and gas related development activities that could one day be proposed within the Canadian waters of Baffin Bay and Davis Strait outside of the Nunavut Settlement Area (NSA), along with their associated adverse effects, benefits, and management strategies.”105 Ultimately, NIRB issued a number of detailed recommendations, including that the federal government extend the five-year moratorium.106
It should also be noted that the Nunavut Agreement and NuPPAA include a comprehensive land-use planning regime that plays a role analogous to regional assessment. This takes the form of a conformity assessment whereby a proposed project must proceed through a threshold step to determine whether the proposal conforms with the relevant land-use plan. In practical terms, a project proponent must submit a proposal to the Nunavut Planning Commission, and the Commission then determines whether the project conforms to the requirements of any approved land use plans.107 If it does, then it can proceed to the project-specific process described above.108 At the time of writing, a draft Nunavut wide land-use plan had been released by the Nunavut Planning Commission,109 which does include content on marine shipping.110
4 Discussion
In this section, we consider the potential for the four assessment processes under the IAA to be part of the governance and decision-making process for considering the impact of shipping on ecological and social systems in the Arctic. We first reflect on the role of the designated project process, and then proceed to projects on federal land, followed by strategic and regional assessments.
4.1 The Designated Project Assessment Process
The designated project process, if it were to be applied in the Western Arctic, would offer the opportunity to consider the full range of implications of shipping in the Arctic associated with any project assessed. The assessment would include benefits and negative impacts, and would assess a broad range of biophysical, economic, social, cultural, and health impacts. The Act specifically requires consideration of gender-based analysis, impacts on Indigenous peoples, and impacts on climate commitments and environmental obligations, among others. The public interest determination to be made at the end of the process is informed by determinations on the contribution of the project on sustainability among other elements. In short, when the process is triggered, it provides every opportunity to broadly consider the shipping element of any proposed new project. As noted in the above discussion about the Nunavut context, by virtue of final decisions resting with a federal minister, the factors in the IAA may also influence assessments even where the IAA is not formally triggered.
As discussed above, the application of the designated project assessment process in the Arctic is limited by the physical activities list and the interplay with territorial and co-management assessment processes. The list does not include a number of activities that may become viable in the longer term, such as aquaculture outside national parks and offshore renewable energy projects other than tidal energy. More immediately, thresholds for listed mining, transportation and energy related activities will exclude smaller projects. Of course, the ministerial discretion to designate projects not listed does provide an opportunity to fill this gap, as does the possibility of amending the list.111
More fundamentally, the application of the designated project assessment process is limited through the interplay between the IAA and the territorial assessment processes discussed above. In the Western Arctic, other than the Yukon North Slope, the IAA, including its designated project process, generally does apply. However, its application is of course shaped by the exercise of harmonization powers that include potentially not requiring a federal assessment even for listed projects, and opportunities for substitution, delegation and joint assessments. In the Eastern Arctic, the default is that the IAA does not apply. As discussed above, there may be opportunities for federal assessments in certain circumstances, particularly panel reviews, but past practice would suggest that these opportunities will be limited. There are also opportunities in the case of the NuPPAA for the responsible minister to consider issues set out in the IAA, such as climate change, impacts on Indigenous communities
4.2 The Federal Projects Assessment Process
As outlined above, there are very few process requirements for so-called federal projects, which for purposes of this chapter is about projects on federal land. Federal land does not include land under the administration of one of the three territorial governments. This will exclude many land-based projects in the Arctic from the IAA’s assessment requirement for projects on federal lands. This is consistent with the exclusion of the application of the IAA in the Yukon and Nunavut.
Where projects are proposed on federal lands in the Arctic, the assessment requirement under sections 81 to 91 would apply to impose some minimal process obligations along with a requirement to make a determination whether the proposed project is likely to cause significant adverse biophysical effects, and, if so, whether such effects are justified in the circumstances. Ultimately, these provisions may serve as a safeguard in case a project on federal lands is not subject to a territorial or Indigenous assessment process, but it is unlikely to add any meaningful process requirements.
It is important to note that while the potential for project level assessments under the IAA to play a significant role in the assessment of shipping related projects is relatively limited, this does not mean the federal government has relinquished its decision-making responsibility. This is apparent from the requirements for projects on federal lands, but is also inherent in the relationship between territorial, co-management, and federal processes outlined in section 4 of the Act. The bottom line is that the federal government still makes project decisions. If the new IAA is the new standard for how federal decisions about major projects are to be made to ensure they are in the public interest, it would be reasonable to expect that federal decision-makers would consider some—if not most—of the same questions set out in section 63 of the IAA when deciding whether to exercise their powers, duties and functions with respect to proposed projects assessed under a territorial or Indigenous assessment process in the Arctic. Thus, while the IAA may strictly speaking not apply to many of the projects, it could still serve as a standard for federal decision-making by considering whether projects make a net contribution to sustainability, and contribute to Canada’s climate commitments and environmental obligations, for example.112
4.3 The Strategic and Regional Assessment Processes
It is with respect to strategic and regional assessments that the most promising opportunities for the application of the IAA arise. Given the discretionary nature of the IAA provisions for regional and strategic assessments, it matters less whether these provisions have formal application in a given part of the Canadian Arctic. In that regard, the limits imposed on the application of the IAA in the Yukon and Nunavut would extend to sections 92–103 of the IAA. In other parts of the Arctic, the provisions for strategic and regional assessments would seem applicable, including with respect to any ocean-based activities in Arctic waters.
However, perhaps the more important consideration is that similar to the project level assessment provisions of the IAA, there is potential for strategic and regional assessments carried out under the IAA to serve as role models for similar assessments in the Arctic region. The examples discussed above illustrate the appetite for higher tier assessments in the region, even if the processes themselves were far from perfect.
There is similarly potential for strategic assessments to contribute to a better understanding of where, how, and under what conditions shipping can maximize its contribution to sustainability in the Canadian Arctic. While the distinction between regional and strategic assessments under the IAA is not clear, a key difference appears to be that strategic assessments are not regionally focused, and their mandate is more constrained than regional assessments. Still, the strategic assessment process offers opportunities to consider specific industry sectors and their potential to make a net contribution to sustainability in the Canadian Arctic, while minimizing negative impacts on natural systems and local communities. Among the issues that could be addressed in strategic assessments are a range of operational impacts, such as vessel source pollution, invasive species, underwater noise, icebreaking, conflict with Indigenous peoples land use, water pollution from operational fuel, and air and land pollution in the form of emissions and black carbon. Another set of challenges includes impacts related to accidents, which would include the consideration of appropriate spill responses, and potentially the ban of certain vessels or cargo from sensitive areas.
Two shipping related issues that are currently under consideration, that seem to us particularly important for inclusion in a strategic assessment on Arctic shipping, would be the establishment of low-impact shipping corridors and deep water ports. As Porta et al. note, questions about northern marine destination/transportation routes have persisted nearly four decades.116 The
As a general observation, it is clear that there has been experience with higher tier assessments in the Arctic, however, the process has tended to be ad hoc, and the scope has tended to be narrow, as seen for example in the sector-specific BREA example discussed above. A more systematic and comprehensive approach to regional and strategic assessments has significant potential, and the provisions in the IAA have the potential to assist with efforts to move in this direction. However, it is important to note that much work remains at the federal level to realize the potential of regional and strategic assessments.120
More generally, it may be time to revisit how the new federal IAA interacts with other assessment processes in the Arctic region. The federal government
Another assessment process with potential implications for the Arctic region on the horizon is the environmental assessment system currently being negotiated as part of the emerging Marine Biodiversity of Areas Beyond National Jurisdiction (BBNJ) regime under the United Nations Convention on the Law of the Sea. Negotiations were delayed by the COVID pandemic, but have now resumed. The environmental assessment regime is being designed for areas beyond national jurisdiction, but two issues currently under negotiation have potential implications for Canadian Arctic waters. One is the impact of projects in Canadian waters on the high seas. The other is the impact of activities on the high seas on Canadian waters. It remains to be seen to what extent these contentious issues will come within the scope of the BBNJ environmental assessment regime.121
Another international dimension relates to the impact of activities in Canada on other coastal States in the Arctic region. For example, in the Mary River Project, the assessment of the expansion of the mine had to consider transboundary impacts in accordance with the UNECE Convention on Environmental Impact Assessment in a Transboundary Context (Espoo Convention), particularly impacts of the project on Greenland. Denmark was identified as an affected party under the Convention and a report outlining potential impacts on Greenland was prepared as part of the assessment.122
5 Conclusion
This chapter highlights the relevant features and attributes of four assessment processes under the IAA. The IAA is far from perfect but has much to offer at the levels of project assessments and higher tier assessments for undertakings related to shipping in the Arctic. Ultimately, any attempts to apply the IAA in the shipping context will have to be sensitive to the complex territorial and
With the continued recession of multiyear ice and the advent of longer shipping seasons there is no doubt about the potential for development in Canada’s Arctic region—development that will rely largely on shipping for the delivery and movement of goods. It is also clear that there has been little consideration of potential shipping impacts in IA s completed for projects that involve shipping. In fact, the inclusion of shipping impacts into IA processes is uncommon, at least in a global context, even though many of the procedural and analytic tools used in IA could be of use when managing shipping practices, impacts and risks.123 It is also clear that the Canadian Coast Guard and local communities have very limited capacity to respond to ship-based spills.124 As a result, many local people have expressed their concerns about the potential for spills and accidents due to increased shipping, as well as the effects of shipping on marine mammals.125
It is in response to this, that the IAA provides an opportunity to consider the impacts of shipping through each of the four assessment processes under the Act. As outlined above, there are critical decisions that need to be made regarding shipping in the Arctic that are particularly well suited for joint strategic or
As such, there is the potential to improve governance for shipping in the Canadian Arctic through the application of the IAA at the project, regional and strategic levels, including through enhanced integration and harmonization between the IAA and other assessment regimes. This is especially so since the IAA identifies specific impacts that require consideration that territorial and co-management assessments currently do not, such as GBA+ and climate change, and that capacity for assessing impacts related to these is being built at the federal level. IA in the Arctic as it applies to shipping and related developments is going to require effort from all governments, local and Indigenous communities, and every research institution active in the Arctic given how rapidly change is actually occurring and the effects of such change on natural and human systems. In the present context, there is great potential for IA in general, and the IAA in particular, to become a well-utilized tool of governance and decision-making in the Arctic.127
Impact Assessment Act, SC 2019, c 28, s 1 [IAA].
Northern Canada Vessel Traffic Services Zone Regulations, SOR/2010-127, s 2 [NORDREG].
Meinhard Doelle and A. John Sinclair, eds., Impact Assessment in Transition: A Critical Review of the Canadian Impact Assessment Act (Toronto: Irwin Law, 2021), 58.
Physical Activities Regulations, SOR/2019-285. There are opportunities to include broader issues in project assessments. For example, an assessment of a marine terminal could consider shipping routes as part of the assessment of the marine terminal.
IAA (n 1), ss 81–91.
Id., ss 92–103.
Jackie Dawson et al., “Temporal and Spatial Patterns of Ship Traffic in the Canadian Arctic from 1990 to 2015,” Arctic 71:1 (2018): 15–26, https://doi.org/10.14430/arctic4698.
David Thurton, “Deep Water Port in Tuktoyaktuk Could Bring Business to N.W.T,” CBC, 2 December 2014, https://www.cbc.ca/news/canada/north/deep-water-port-in-tuktoyaktuk-could-bring-business-to-n-w-t-1.2857238.
The Canadian Press, “Feds Announce Long-Awaited Deepwater Port for Qikiqtarjuaq, Nunavut,” CBC, 4 August 2021, https://www.cbc.ca/news/canada/north/qikiqtarjuaq-port-announcement-1.6129497; Patricia Lightfoot, “Chesterfield Inlet Mayor Pitches Deep-Sea Port to Ease Effects of Increased Shipping,” Nunatsiaq News, 11 February 2020, https://nunatsiaq.com/stories/article/chesterfield-inlet-mayor-pitches-deep-sea-port-to-ease-effects-of-increased-shipping/; Simione Sammurtok, “Deep-Sea Port Harbour – Chesterfield Inlet, Nunavut” (Tabled Document, Chesterfield Inlet NU, 2018), https://assembly.nu.ca/sites/default/files/TD-10-5(1)-EN-Correspondence-from-the-Municipality-of-Chestefield-Inlet-Marine-Infrastructure.pdf.
WWF Canada, Arctic Shipping, Avoiding Catastrophe: Managing the Risks of More Marine Traffic in Canada’s Arctic Waters (Toronto: World Wildlife Fund Canada, 2014). See also Nicole Mortillaro, “Crystal Serenity’s Journey Through Northwest Passage Draws Excitement, Climate Change Fears,” Global News, 29 August 2016, https://globalnews.ca/news/2908883/crystal-serenitys-journey-through-northwest-passage-draws-excitement-climate-change-fears/; Ben Weber, “Northerners Consider New Cruise Ship Rules After Crystal Serenity’s Voyage,” The Canadian Press, 18 September 2016, https://www.cbc.ca/news/canada/north/new-rules-for-arctic-cruises-1.3767846.
Julien Gignac, “Massive Increase in Nunavut Mine Shipping Traffic Puts Narwhals at Risk,” The Narwhal, 19 February 2021, https://thenarwhal.ca/massive-increase-in-nunavut-mine-shipping-traffic-puts-narwhals-at-risk-study/.
Dawson et al. (n 7), pp. 15–26.
Of course, the United Nations Declaration on the Rights of Indigenous Peoples Act, SC 2021, c 14, will have significant implications, particularly the commitment to review federal legislation to ensure consistency with United Nations Declaration on the Rights of Indigenous Peoples (UNDRIP).
Anna Johnston, “Federal Jurisdiction and the Impact Assessment Act: Trojan Horse or Rational Ecological Accounting?”, in Doelle and Sinclair, eds. (n 3), pp. 97–118.
Layla Hughes et al., “Framework for the Development of Nunavut Community Oil Spill Response Plans: A Report to WWF Canada” (2017), retrieved from http://awsassets.wwf.ca/downloads/170405___oilspillresponsecapacitynunavut_web.pdf?_ga=1.192463919.46488933.1485191209.; Sarah Gulas et al., “Declining Arctic Ocean Oil and Gas Developments: Opportunities to Improve Governance and Environmental Pollution Control,” Marine Policy 75 (2017): 53–61, https://doi.org/10.1016/j.marpol.2016.10.014; J. Fredrik Lindgren et al., “Discharges to the Sea,” in Shipping and the Environment: Improving Environmental Performance in Marine Transportation, eds., Karin Andersson et al. (Berlin, Heidelberg: Springer-Verlag, 2016), 125–168, at 131, https://doi.org/10.1007/978-3-662-49045-7. See also Vincent, Lovejoy and Bartenstein in this volume.
Gulas et al. (n 15), pp. 53–61, at 55.
WWF Canada (n 10).
Lindgren et al. (n 15), pp. 125–168, at 131.
Jerome Marty et al., “Evaluation of the Risk of Oil Spills in Canadian Arctic Waters,” June 2016, AMOP Conference.
Jeremy Wilkinson et al., “Oil Spill Response Capabilities and Technologies for Ice-covered Arctic Marine Waters: A Review of Recent Developments and Established Practices,” Ambio 46:3 (2017): 423–441, https://doi.org/10.1007/s13280-017-0958-y.
Lindgren et al. (n 15), pp. 125–168, at 140–141.
Dawson et al. (n 7), pp. 15–26.
Lindgren et al. (n 15), pp. 125–168.
Id., 125.
The impact of icebreaking is among the many shipping related impact that warrants consideration in assessments of shipping activities in the Arctic. Icebreaking is expected, for example, to contribute to Arctic ice loss that, in turn, can exacerbate the climate change effects by reducing ice albedo. See Adolf K.Y. Ng et al., “Implications of Climate Change for Shipping: Opening the Arctic Seas,” WIRE s Climate Change (2018). See also Jackie Dawson et al., “Infusing Inuit and Local Knowledge into the Low Impact Shipping Corridors: An Adaptation to Increased Shipping Activity and Climate Change in Arctic Canada,” Environmental Science and Policy 105 (2020): 19–36, https://reader.elsevier.com/reader/sd/pii/S1462901119309451?token=EC2EF6421923CBC84F7762CD86CA8BD5BE633C57B9FA02017908381116928563A3EE349155856DCBE46E0FC06E8613CB&originRegion=us-east-1&originCreation=20220526161948.
Alun Anderson, “The Great Melt: The Coming Transformation of the Arctic,” World Policy Journal 26:4 (2009): 53–64, https://doi.org/10.1162/wopj.2010.26.4.53; Dimitrios Theocharis et al., “Arctic Shipping: A Systematic Literature Review of Comparative Studies,” Journal of Transport Geography 69 (2018): 112–128, https://doi.org/10.1016/j.jtrangeo.2018.04.010; Shengda Zhu et al., “The Environmental Costs and Economic Implications of Container Shipping on the Northern Sea Route,” Maritime Policy and Management 45:4 (2018): 456–477, https://doi.org/10.1080/03088839.2018.1443228.
See Lasserre in this volume.
IAA (n 1), s 9. The power to designate is fairly broad, however, the expectation is that assessments that go beyond individual activities will be assessed under the processes for strategic or regional assessments rather than under the designated project assessment process.
Physical Activities Regulations, SOR/2019-285.
See Meinhard Doelle and A. John Sinclair, “The New IAA in Canada: From Revolutionary Thoughts to Reality” Environmental Impact Assessment Review 79 (2019): 106292, https://doi.org/10.1016/j.eiar.2019.106292.
Id., 57–59.
IAA (n 1), s 22(1)(q) and (r), respectively.
Id.
Doelle and Sinclair eds. 2021 (n 3), p. 61.
Id., 67.
The other category not relevant here involves projects outside Canada that are supported in some way by the federal government, usually in the form of federal funding.
See Jamie Kneen, “Impact Assessment for Projects on Federal Lands and Outside Canada: The “Federal Projects” Process,” in Doelle and Sinclair eds. (n 3), pp. 388–411.
IAA (n 1), s 2.
See id., ss 81–91.
See id., ss 84, 86, 89.
Kneen (n 37), p. 390.
Id.
See IAA (n 1), ss 92–103.
See discussion of the definition of federal lands in the previous subsection.
At present there are no self-government agreements finalized across Nunavut, the North Slope, or the Inuvialuit Settlement Region/NWT. In light of the Arctic focus of the book, we are not discussing Nunavik or Nunatsiavut in this chapter.
IAA (n 1), s 95. These provisions are new to the federal assessment process, so while there are examples of strategic and regional assessments carried out elsewhere, there is not enough experience to draw on federally to predict how these discretionary provisions will be exercised.
See Daniel W. Dylan, “The Complicated Intersection of Politics, Administrative and Constitutional Law in Nunavut’s Environmental Impacts Assessment Regime,” University of New Brunswick Law Journal 68 (2019): 202–231.
Indian and Northern Affairs Canada, The Western Arctic Claim: The Inuvialuit Final Agreement (1984) [IFA], https://yukon.ca/sites/yukon.ca/files/eco/eco-ar-western_arctic_claim_inuvialuit_final-agreement.pdf.
Crown-Indigenous Relations and Northern Affairs Canada, “Environmental Assessments in Canada’s North,” Government of Canada, last modified 19 December 2018, https://www.rcaanc-cirnac.gc.ca/eng/1466431262580/1547478287247#Northwest_Territories_inuvialuit.
IFA (n 48), Article 11(32). See also Crown-Indigenous Relations and Northern Affairs Canada (n 49); Figure 16.2.
See, e.g., Canada Energy Regulator, “ARCHIVED – Agreement for an Environmental Impact Review of the Mackenzie Gas Project,” last modified 29 September 2020, https://www.cer-rec.gc.ca/en/about/acts-regulations/other-acts/cooperative-agreements/archive/agreement-environmental-impact-review-mackenzie-gas-project.html.
See generally Government of Canada, “Territorial Environmental Assessment Processes,” last modified 25 May 2021, https://www.northernstrategy.gc.ca/eng/1619440955879/1619440977808?wbdisable=true.
IAA (n 1), s 22(1)(q); see also David V. Wright, “Interest Versus Indigenous Confidence: Indigenous Engagement, Consultation, and ‘Consideration’ in the Impact Assessment Act” (23 July 2020), https://ssrn.com/abstract=3692839; Sarah Morales, “Indigenous-led Assessment Processes as a Way Forward,” Centre for International Governance Innovation: Environmental Challenges on Indigenous Lands Series, 4 July 2019, https://www.cigionline.org/articles/Indigenous-led-assessment-processes-way-forward (providing a succinct description and discussion of Indigenous-led assessment, including examples).
Mackenzie Valley Review Board, “Mackenzie Gas Project – EIR0405-001,” https://reviewboard.ca/registry/eir0405-001.
Jimmy Thomson, “N.W.T. Gov’t Exploring LNG Project Off Canadian Arctic Coast,” CBC, 10 November 2020, https://www.cbc.ca/news/canada/north/nwt-lng-offshore-arctic-request-proposal-oil-1.5795317.
David Thurton, “Deep Water Port in Tuktoyaktuk Could Bring Business to N.W.T,” CBC, 2 December 2014, https://www.cbc.ca/news/canada/north/deep-water-port-in-tuktoyaktuk-could-bring-business-to-n-w-t-1.2857238.
Physical Activities Regulations, SOR/2019-285, ss 52, 53.
See Duane Ningaqsiq Smith and John Lucas, “Re: Brief to the Standing Committee on Environment and Sustainable Development regarding Bill C-69 An Act to enact the Impact Assessment Act and the Canadian Energy Regulator Act, to amend the Navigation Protection Act and to make consequential amendments to other Acts” (Letter to Standing Committee on Environment and Sustainable Development, Our Commons Committee Brief, Ottawa, 6 April 2018), https://www.ourcommons.ca/Content/Committee/421/ENVI/Brief/BR9837758/br-external/InuvialuitRegionalCorporation-e.pdf.
Yukon Environmental and Social-Economic Assessment Act, SC 2003, c 7, s 6 [YESAA].
Id., ss 90–91.
Id., s 90(2).
This is by virtue of YESAA, id., s 91(2) which states, “[w]here a project located on the Yukon North Slope is referred to the Review Board by the Screening Committee… the provisions of this Part relating to assessments and decision documents cease to apply in respect of the project” (note that this “Part” is referring to YESAA “Part 2 – Assessment Process and Decision Documents”).
Mackenzie Valley Resource Management Act, SC 1998, c 25, ss 2, 6.
See also Lalonde and Bankes in this volume.
Agreement between the Inuit of the Nunavut Settlement Area and Her Majesty the Queen in Right of Canada (25 May 1993), Article 12, http://www.tunngavik.com/documents/publications/1993-00-00-Nunavut-Land-Claims-Agreement-English.pdf [Nunavut Agreement].
Id., Article 12.2.2. See generally Crown-Indigenous Relations and Northern Affairs Canada, “Nunavut’s Regulatory Regime,” Government of Canada, last modified 19 December 2018, https://www.rcaanc-cirnac.gc.ca/eng/1466431262580/1547478287247#Nunavut_regulatory_regime.
Nunavut Agreement (n 65), Article 12.2.
Nunavut Planning and Project Assessment Act, SC 2013, c 14, s 2 [NuPPAAA].
Crown-Indigenous Relations and Northern Affairs Canada, “Nunavut Planning and Project Assessment Act (NuPPAAA) – Highlights,” Government of Canada, accessed 1 June 2022, https://www.rcaanc-cirnac.gc.ca/eng/1436379471116/1547483079595.
IAA (n 1), s 7. Note that these areas are both explicitly defined in Articles 3 and 16 of the Nunavut Agreement (n 65), respectively.
Pursuant to the process set out in NuPPAA (n 68), ss 86–98.
The definition of responsible minister is set out in section 73(1) as follows: (a) the federal minister or the territorial minister, as the case may be, who has the jurisdictional responsibility for authorizing a project to proceed; or (b) the Minister of Northern Affairs, if there is no federal minister or territorial minister who has the responsibility referred to in paragraph (a).
NuPPAA (n 68), s 94(1). The details of a Federal Environmental Assessment Panel and associated process are explicitly set out in sections 115–133. In such a situation, it is the federal Minister of the Environment who is responsible for the federal environmental assessment panel process.
Id., s 94(2).
Id., s 94(3).
For the general context about these waters see Oceans North, “Baffin Bay & Davis Strait,” https://www.oceansnorth.org/en/where-we-work/baffin-bay-davis-strait/.
NuPPAA (n 68), ss 115–133.
Id.
Id., s 103(1)(p).
IAA (n 1), ss 22(1)(i), 22(1)(h).
See discussion above on projects on federal lands.
NuPPAA (n 68), s 104(3).
See Nunavut Impact Review Board (NIRB), Project Certificate [No.:005], 28 December 2012, https://www.nirb.ca/portal/dms/script/dms_download.php?fileid=290662&applicationid=123910&sessionid=mg6cmd2pc9g12pvoqnp642ql43.
Note that this project predated NuPPAA. Prior to NuPPAA there was an amendment to the Nunavut Agreement to explicitly clarify that CEAA “and any successor legislation replacing that Act” did not apply in the Nunavut context. See Nunavut Tunngavik, “Article 12.12.7–Canadian Environmental Assessment Act,” https://nlca.tunngavik.com/?page_id=1475. For context and analysis of the Nunavut regime in the early days after the Nunavut Agreement was finalized, see Michael J Hardin and John Donihee, eds., Mineral Exploration and Mine Development in Nunavut: Working with the New Regulator Regime (Canadian Institute for Resources Law, 1997).
See NIRB Project Certificate [NO.: 005] (n 83), p. 4.
Canadian Science Advisory Secretariat Science Response, Science Review of the Phase 2 Addendum to the Final Environmental Impact Statement for the Baffinland Mary River Project, Fisheries and Oceans Canada, April 2019, https://waves-vagues.dfo-mpo.gc.ca/Library/40783844.pdf.
Id., p. 2.
See Project Certificate No. 005, Amendment 003, “Schedule of Amendments to the Nunavut Impact Review Board’s Mary River Project Certificate,” 18 June 2020.
NIRB File No.: 08MN053; NWB File No.: 2AM-MRY1325 (Amendment No. 2).
Canadian Science Advisory Secretariat (n 86), pp. 2–3.
See, e.g., id., 38.
See NIRB, “Highlights Document for the Board’s Reconsideration Report and Recommendations for Baffinland’s Phase 2 Development Proposal,” NIRB File No. 08MN053, May 2022, p. 1, https://www.nirb.ca/portal/dms/script/dms_download.php?fileid=339559&applicationid=124701.
Honourable Dan Vandal, Member of Parliament and Minister of Northern Affairs, Letter to Chairperson of the Nunavut Impact Review Board, 16 November 2022, https://www.nirb.ca/portal/dms/script/dms_download.php?fileid=342156&applicationid=124701&sessionid=tbgvg6qmij3fliur3ocud84is4.
Beaufort Regional Environmental Assessment (BREA), “Key Findings: Research and Working Group Results,” March 2016, https://www.beaufortrea.ca/wp-content/uploads/2018/06/NCR-10615510-v1-BREA_FINAL_REPORT.pdf.
Id., xi.
Id., xi, 157; see generally Government of Canada, “Backgrounder: Beaufort Regional Environmental Assessment (BREA),” last modified 27 February 2012, https://www.canada.ca/en/news/archive/2012/02/backgrounder-beaufort-regional-environmental-assessment-brea.html.
Id. The nine research areas: baseline fish information; coastal and marine birds; bird, fish, and marine mammal information; worst‐case environmental design limits for ice; sea ice types and extreme ice features; coupled ocean‐ice‐atmosphere modeling and forecasting; offshore geohazards and coastal processes; web‐based geospatial analysis tool; community priorities. The six working groups: Cumulative Effects Working Group; Climate Change Working Group; Social, Cultural, and Economic Indicators Working Group; Oil Spill Preparedness and Response Working Group; Waste Management Working Group; Information Management Working Group.
BREA (n 94), p. 150.
Beaufort Regional Strategic Environmental Assessment, “About,” accessed 31 May 2022, https://rsea.inuvialuit.com/.
KAVIK-Stantec Inc. “Beaufort Region Strategic Environmental Assessment: Data Synthesis and Assessment Report,” 31 July 2020, https://rsea.inuvialuit.com/docs/NCR10615510-v1-BREA_FINAL_REPORT.PDF; Beaufort Regional Environmental Assessment website, https://www.beaufortrea.ca/.
Marco Vigliotti “Trudeau Government Expands Moratorium on Oil and Gas Work in Arctic Waters,” iPolitics, 8 August 2019, https://ipolitics.ca/2019/08/08/trudeau-government-expands-moratorium-on-oil-and-gas-work-in-arctic-waters/.
NIRB, “Final Scope List for the NIRB’s Strategic Environmental Assessment in Baffin Bay and Davis Strait,” NIRB File No. 17SN034, 9 March 2018, https://www.nirb.ca/publications/strategic%20environmental%20assessment/180309-17SN034-Final%20Scope%20List-OPAE.pdf.
Crown-Indigenous Relations and Northern Affairs Canada, “Arctic Regional Environmental Studies: Beaufort Regional Strategic Environmental Assessment,” Government of Canada, accessed 31 May 2022, https://www.rcaanc-cirnac.gc.ca/eng/1492023135343/1538588674968#chp1.
NIRB, “Final Report for the Strategic Environmental Assessment in Baffin Bay and Davis Strait: Volume 1: SEA Summary Report,” July 2019, https://www.nirb.ca/publications/Strategic%20Environmental%20Assessment/first%20row-first%20file%20-190731-17SN034-Final%20SEA%20Report-Volume%201-OPAE.pdf.
Id., iii.; see also, NIRB “Strategic Environmental Assessment in Baffin Bay & Davis Strait,” Presentation, Arctic Oil & Gas Symposium, Calgary, Alberta, 20 March 2018, https://www.nirb.ca/publications/presentations/180321-NIRB%20Presentation%20Arctic%20Oil%20and%20Gas%20Symposium-OEDE.pdf.
Elaine Anselmi, “Extend Offshore Oil and Gas Moratorium, Says Nunavut Review Board,” Nunatsiaq News, 2 August 2019, https://nunatsiaq.com/stories/article/extend-offshore-oil-and-gas-moratorium-says-nunavut-review-board/.
NIRB, “Projects Requiring Assessment,” accessed 1 June 2022, https://www.nirb.ca/content/projects-requiring-assessment.
Id.
Nunavut Planning Commission, Draft Nunavut Land Use Plan Draft, July 2021, https://www.nunavut.ca/land-use-plans/draft-nunavut-land-use-plan.
Id., 42, and tables 4 and 5.
IAA (n 1), s 9.
For discussion of the IAA as a potential basis for reform of northern assessment regimes, see David V. Wright, “Bill C-88 Elimination of the MVRMA ‘Superboard’: Small Step or Start of Big Leaps in Modern Treaty Implementation,” November 2019 Northern Public Affairs (Modern Treaties Implementation Research Project).
Carolyn Bennett, Minister of Indigenous and Northern Affairs Canada, “Announcement of Canada’s Support for the United Nations Declaration of Indigenous Peoples” (Speech delivered at the 15th Session of the United Nations Permanent Forum on Indigenous Issues, New York, 10 May 2016), https://www.canada.ca/en/indigenous-northern-affairs/news/2016/05/speech-delivered-at-the-united-nations-permanent-forum-on-indigenous-issues-new-york-may-10-.html.
United Nations Declaration on the Rights of Indigenous Peoples, UN Doc A/RES/61/295 (13 September 2007) [UNDRIP].
United Nations Declaration on the Rights of Indigenous Peoples Act (n 13).
Louie Porta et al., “Shipping Corridors as a Framework for Advancing Marine Law and Policy and the Canadian Arctic,” Ocean and Coastal Law Journal 22:1 (2017): 63–84.
Fisheries and Oceans Canada, “Northern Low-Impact Shipping Corridors,” Government of Canada, accessed 1 June 2022, https://www.dfo-mpo.gc.ca/about-notre-sujet/engagement/2021/shipping-corridors-navigation-eng.html.
Michael Levitt, Chair, Nation-Building at Home, Vigilance Beyond: Preparing for the Coming Decades in the Arctic, Report of the Standing Committee on Foreign Affairs and International Development, April 2019, 42nd Parliament, 1st Session, 68. Retrieved from House of Commons, http://www.ourcommons.ca/Content/Committee/421/FAAE/Reports/RP10411277/faaerp24/faaerp24-e.pdf.
Dawson et al. 2020 (n 25). See also Dawson and Song in this volume.
Jason MacLean, Bram Noble and Jill Blakley, “Strategic and Regional Environmental Assessments,” in Doelle and Sinclair, eds. (n 3), 372–387, at 381.
See, for example, Meinhard Doelle and Gunnar Sander, “Next Generation Environmental Assessment in the Emerging High Seas Regime? An Evaluation of the State of the Negotiations,” International Journal of Marine and Coastal Law 35:3 (2020): 498–532, https://ssrn.com/abstract=3479657.
NIRB, “Espoo Report Phase 2 Proposal – Mary River Project, Baffinland Iron Mines Corporation, Mary River Project,” NIRB File No. 08MN053.
Karin Andersson et al., “Methods and Tools for Environmental Assessment,” in Andersson et al., eds. (n 15), 265–293 https://doi.org/10.1007/978-3-662-49045-7. Impact assessments carried out by the NIRB in Canada have commonly included shipping-related impacts.
Elise DeCola, Sierra Fletcher and Layla Hughes, Framework for the Development of Nunavut Community Oil Spill Response Plans: Report to WWF-Canada (March 2017); see also, Layla Hughes, Background Information for Community Oil Spill Response Planning in Pond Inlet, Resolute, Grise Fiord, and Arctic Bay: Report to WWF-Canada (March 2017), both at http://awsassets.wwf.ca/downloads/170405___oilspillresponseframeworknunavut_web.pdf.
Dawson (n 7), p. 33.
And it should be noted that the IAA will be implemented in an administrative law context that involves closer scrutiny of administrative decision-making and associated justification given the standard of review set out in Canada (Minister of Citizenship and Immigration) v. Vavilov, 2019 SCC 65. See Shaun Fluker, “Vavilov and the Judicial Review of Natural Resources, Energy and Environmental Decisions in Canada,” Canadian Institute of Resources Law No 123 (2020), https://cirl.ca/sites/default/files/Resources/Resources123.pdf. See also Nigel Bankes, “The Discipline of Vavilov? Judicial Review in the Absence of Reasons” (ABlawg, 12 May 2020), https://ablawg.ca/2020/05/12/the-discipline-of-vavilov-judicial-reason-in-the-absence-of-reasons/.
Andersson et al. (n 123), pp. 265–293.